Files
swift-nio/docker
Si Beaumont 55d4c49334 Better align shutdown semantics of testing event loops (#2800)
### Motivation:

The two testing event loops—`EmbeddedEventLoop` and `NIOAsyncTestingEventLoop`—have different semantics for outstanding work during shutdown, which are both different from the production `SelectableEventLoop`, specifically with newly scheduled tasks that result from running existing scheduled work at the time of shutdown.

There are three axes to consider:

1. Scheduled tasks that are at or past their deadline.
2. Scheduled tasks with a deadline in the future.
3. Newly scheduled work that result from either running or cancelling (1) and (2).

| | (1) | (2) | (3) |
|-|-|-|-|
| `SelectableEventLoop` | Run | Cancel | Quiesce over 1000 ticks, repeatedly run resulting (1) and cancel resulting (2) |
| `EmbeddedEventLoop` | Run | Cancel | Cancel resulting (1) and resulting (2) |
| `NIOAsyncTestingEventLoop` | Run | Run | Run resulting (1) and resulting (2) |

Note that `NIOAsyncTestingEventLoop` may never terminate because of this.

### Modifications:

This PR aligns `EmbeddedEventLoop` and `NIOTestingEventLoop` and makes them more similar to `SelectableEventLoop` and less surprising semantics.

### Result:

| | (1) | (2) | (3) |
|-|-|-|-|
| `SelectableEventLoop` | Run | Cancel | Quiesce over 1000 ticks, repeatedly run resulting (1) and cancel resulting (2) |
| `EmbeddedEventLoop` | Run | Cancel | Cancel resulting (1) and resulting (2) |
| `NIOAsyncTestingEventLoop` | Run | Cancel | Cancel resulting (1) and resulting (2) |

### Future work:

Given both the `EmbeddedEventLoop` and `NIOAsyncTestingEventLoop` are used in tests of NIO applications that run with `SelectableEventLoop` in production, it might be worth extending both to also support quiescing to give a more representative shutdown behaviour in tests.
2024-07-25 14:38:36 +00:00
..