Following on from https://github.com/apple/swift-nio/pull/3126 delete
`Benchmarks/Thresholds/nightly-6.1` and
`IntegrationTests/tests_04_performance/Thresholds/nightly-6.1.json`
which is no longer needed now that the shared benchmarks workflow has
been updated.
Use nightly_next as swift version
see https://github.com/apple/swift-nio/pull/3122
Motivation:
To not have to rename threshold directories when the nightly branch
changes.
Modifications:
* Use nightly_next as swift version in the matrix generation script
which
is picked up by the benchmark script.
* Move nightly-next thresholds and add legacy symlink
Result:
Benchmark thresholds will attempt to find directories named
nightly_next, not nightly_6_1.
Motivation:
As pointed out in #3071, the `flatScheduleTask` implementations can be
improved.
Modifications:
- Refactor the `flatScheduleTask` implementations to skip `flatMap`
calls, which avoids creating an extra promise.
- As there is now a lower number of allocations, reduce the necessary
thresholds for the allocation tests.
Result:
Reduction in the number of allocations in the package.
---------
Co-authored-by: George Barnett <gbarnett@apple.com>
### Motivation:
Some changes were missed in #3076, passing through parameters for the
new 6.1 version.
### Modifications:
Pass through more parameters, clean up misleading comments.
### Result:
6.1 nightly runs will be more like 6.0 nightly runs were
Motivation:
Users of SelectableEventLoop deserve to have their code that uses the
isolated event loop view perform at least as well as the code that
doesn't.
Modifications:
- Adopt the extra protocol witnesses.
- Refactor out common code.
Result:
Better performance
---------
Co-authored-by: George Barnett <gbarnett@apple.com>
Motivation
Right now the isolated view on the EventLoop has to implement its
interface in terms of UnsafeTransfer, because there are no non-Sendable
operations it can use.
That hurts us because we have to allocate an extra closure for all these
operations, making them slower than they need to be. This is unavoidable
in some contexts, but most EventLoops would be able to offer a fast-path
that avoids this extra allocation.
To achieve that, we need to move this logic into a customisation point
on the EventLoop protocol. Our fallback default implementation can be
the same as we do today.
Modifications
- Add customisation points for EventLoop for each of its operations that
has a protocol witness already.
- Add default implementations of these, using the implementation from
EventLoop.Isolated.
Results
No behavioural changes, but the code has moved.
---------
Co-authored-by: George Barnett <gbarnett@apple.com>
Motivation:
As with the ELF operations before them, the isolated EL operations
currently incur overhead above-and-beyond the overhead of their
non-isolated counterparts. That's not what we want to see. However,
before we "fix" them, we need to add regression testing to confirm our
fix actually worked.
Modifications:
- Add isolated variations of all current EL scheduling tests.
- Where isolated methods didn't have alloc counter tests, add new ones
for the non-isolated versions too.
Result:
More tests.
### Motivation:
The bootstraps are the next most obvious target for cleaning up
Sendability issues. These issues are mostly just missing annotations,
but there are a few places where we had actual latent threading bugs
that were missed. A lot more of the control flow is made more explicit
in this patch, and in general it should get a lot easier to be confident
that the code is correct.
### Modifications:
- Add necessary `@Sendable` annotations
- Clean up some incorrect `self` captures of bootstraps, which are not
`Sendable`, and which could lead to real threading bugs
- Make a few methods `static` to avoid needing to capture `self` at all.
- Make a few threading assumptions clear by using the isolated views or
the sync operations
- Add some missing `Sendable` constraints on interior generic functions.
### Result:
Better safety, better correctness in the bootstraps.
Motivation:
Unfortunately, closure composition is really expensive: closures that
capture closures always heap allocate. To make ELF.Isolated perform
well, then, we need to inline the method bodies directly.
Modifications:
- Add some isolated functions into ELF for enqueueing callbacks.
- Inline the implementation of the ELF methods into the isolated view.
Result:
Allocation counts match between isolated/nonisolated.
Motivation:
We've added isolated views onto EventLoopFutures. These are great, but
as initially implemented they add a bunch of overhead to the nonisolated
versions. That's not optimal, but before we change the code we should
make sure we have a benchmark baseline.
Modifications:
- Extend the test_future_lots_of_callbacks alloc test to add all the
callbacks that the isolated views have.
- Duplicate that test to one that adds isolated wrappers so we can
compare.
Result:
Two regression tests whose allocation counts should be equal, but
aren't.
Motivation:
NIOEmbedded is used all over NIO-land for testing various pieces of the
infrastructure, and so requires a substantial audit for strict
concurrency.
Modifications:
- Mark a few things Sendable.
- Fix the tests, which actually did have some nasty bugs
Result:
Sendable-clean NIOEmbedded
Motivation:
When converting an Array that holds existentials, it is necessary for
Swift to allocate a new Array and copy the elements into it, so that it
can fix up their existential boxes. We forced this to happen with taking
a `[ChannelHandler]` to `[ChannelHandler & Sendable]`, without rewriting
the other functions.
The result of that was that the other functions needed to convert the
channel handler types, causing extra allocations in this path.
Modifications:
Propagate the constraint down to the point where we iterate the Array.
Result:
Allocations reduced.
Motivation:
Unfortunately the current script has a bug meaning it can never fail.
Modifications:
Change bracketing for output search.
Result:
Allocation tests will flag when failing
### Motivation:
The two testing event loops—`EmbeddedEventLoop` and `NIOAsyncTestingEventLoop`—have different semantics for outstanding work during shutdown, which are both different from the production `SelectableEventLoop`, specifically with newly scheduled tasks that result from running existing scheduled work at the time of shutdown.
There are three axes to consider:
1. Scheduled tasks that are at or past their deadline.
2. Scheduled tasks with a deadline in the future.
3. Newly scheduled work that result from either running or cancelling (1) and (2).
| | (1) | (2) | (3) |
|-|-|-|-|
| `SelectableEventLoop` | Run | Cancel | Quiesce over 1000 ticks, repeatedly run resulting (1) and cancel resulting (2) |
| `EmbeddedEventLoop` | Run | Cancel | Cancel resulting (1) and resulting (2) |
| `NIOAsyncTestingEventLoop` | Run | Run | Run resulting (1) and resulting (2) |
Note that `NIOAsyncTestingEventLoop` may never terminate because of this.
### Modifications:
This PR aligns `EmbeddedEventLoop` and `NIOTestingEventLoop` and makes them more similar to `SelectableEventLoop` and less surprising semantics.
### Result:
| | (1) | (2) | (3) |
|-|-|-|-|
| `SelectableEventLoop` | Run | Cancel | Quiesce over 1000 ticks, repeatedly run resulting (1) and cancel resulting (2) |
| `EmbeddedEventLoop` | Run | Cancel | Cancel resulting (1) and resulting (2) |
| `NIOAsyncTestingEventLoop` | Run | Cancel | Cancel resulting (1) and resulting (2) |
### Future work:
Given both the `EmbeddedEventLoop` and `NIOAsyncTestingEventLoop` are used in tests of NIO applications that run with `SelectableEventLoop` in production, it might be worth extending both to also support quiescing to give a more representative shutdown behaviour in tests.
Motivation:
The Swift 6 compiler emits a number of warnings about sendability which
we haven't dealt with yet. The CI failing on warnings may mask other
compilation issues or test failures.
Modifications:
- Disable warnings as errors on Swift 6 and main
Result:
Swift 6 and main CI should pass
# Motivation
Another reusable check is to make sure that all library products of a package are successfully building when consumed from a module that has Cxx interoperability enabled. Another check that's missing is running the integration tests.
# Modification
This PR adds two new checks to the reusable workflow. One to check for Cxx interoperability compatibility and another one to run the integration tests. I also fixed a misalgined name for the nightly benchmarks.
# Result
This should be one of the last reusable workflow checks.